Interior footings are scheduled for tomorrow, as is an inspection on the temporary power pedestal. Hopefully the third time is the charm. I told Jason that they could piggy-back with either the power or footing inspections for the sewer.
Monday, August 25, 2008
Utilities Connected
Today the excavation guys got sewer and water lines connected and a conduit buried for the power. The water line is buried to the left of the sewer line shown in the picture. They also mostly completed the backfill of the overdig, but can't finish up in front of the garage until the sewer connection passes inspection.