Showing posts with label roofing. Show all posts
Showing posts with label roofing. Show all posts

Saturday, December 6, 2008

Major HVAC progress and Roofing completed


Jim had his knee replaced yesterday, and today the HVAC guys he arranged to replace him came and finished almost all the supply runs in the attic, and part of the trunk downstairs. It looks good.

Alan had some things come up and couldn't finish the roofing himself, but he sent Moises, and he was fast. He came Thursday afternoon, and was done by this afternoon.

Thursday, October 9, 2008

Framing Substantially Complete


The roof is now ready to be dried in, and that is scheduled to begin on Saturday. Ironically, the weather may be bad enough to prevent weather-proofing. The windows should be done the middle of next week, and the doors by the end of the week. Once we can lock things up, then we can start pulling wire and running copper pipes.