All of the gaspipe is now installed, and the system is pressurized for testing, and this morning the inspector came and passed it off. I've ordered the meter, and now we'll be able to run the fireplace and/or furnace as soon as they're installed. We probably won't run them much before we're insulated, because that will cost a lot.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment